Performing Arts Campus East Wing Renovation

The Performing Arts Campus was formerly the Madison Elementary School. The District has done several renovations to the campus and has recently added the Broad Stage and Second Space as part of a Performing Arts Center. The campus is also home to the Music Department. Constructed in the 1930’s the original buildings East Wing have some seismic deficiencies that need to be remedied. The one-story East Wing currently houses a multipurpose room and some offices. The Facilities Master Plan shows the east wing being replaced by a new two-story facility that would include a multipurpose room, offices and music classroom/labs. Approximately 4,500 GSF would be demolished and replaced by a new building of approximately 12,000 GSF. Architects submitting for this project must have experience with multipurpose rooms and specialized classrooms.

Project Type: 

Welcome to LPI, Inc.

We hope that you like our website! We have worked diligently to improve not only the design and layout of this site but also the ease of use and quality of information. Check back often as we hope to bring you even more information about LPI, Inc. and our work.

Thank you for visiting!

– Lee Paul, President

Connect

Phone (805) 915-4722
Fax (866) 419-3740

2655 1st St. Ste 250
Simi Valley, CA 93063